Modern production halls with bridge cranes on the A14 motorway near Magdeburg

This property has already been brokered. It's only published for reference purpose. You can find our current offers on this page.

General information

type of offer: 
hall / warehouse / purchase
identification: 
333
address: 
39240 Förderstedt
Germany / Sachsen Anhalt

Detailed description

This modern production facility was built in 2008 in traditional industrial construction with state-of-the-art equipment. In terms of the production area, the office building is manageable and contemporary. Numerous sanitary facilities with showers correspond to a production plant for approx. 60 employees according to the most modern requirements.
Designed and built for steel construction, there are numerous other possible uses for the future. The hall area can be expanded to almost double the area at any time due to the large property.

The production hall
It is at ground level through several gates and can also be accessed via a ramp. In the hall there are two hall cranes with a load capacity of 5 tons each. The hook height is approximately 5.80 m. There are floor ducts throughout the hall for an optimized underground supply. Several power supply sources and compressed air connections ensure the optimal supply.

The office building
Connected to the workshop and the social rooms are the break room and social rooms on the ground floor. The administrative area is on the upper floor.
Corridors 106.00 m²
Break room 41.50 m²
Social area 98.50 m²
Office space 137.50 m²
Technical supply 23.30 m²
Total area 406.80 m²

Side wing
All technical connection and supply rooms as well as a laboratory are located here
Technical supply 529.70 m²
Office space 81.90 m²
Corridors and sanitary facilities 25.60 m²
Laboratory 72.00 m²
Total area 709.20 m²

+++ Further information, pictures, floor plans and even more real estate can be found at www.schroeder-busch.de +++

Location description

The Brumby industrial park is located directly on the A14 and only a few kilometers from Staßfurt and Calbe. The roads to the industrial park are excellently developed.
The journey time to Leipzig / Halle Airport is approx. 60 minutes, to Magdeburg or the A2 motorway connection approx. 20 minutes.

Images

image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image