General information
hall / warehouse / purchase
identification:
324
06766 Bitterfeld-Wolfen / Thalheim
Germany / Sachsen Anhalt
Detailed description
This high-quality Goldbeck Hall, built in 2006, was previously used as a production facility in the solar sector. Due to the production purpose, valuable materials were built in here to meet the high quality requirements similar to laboratory production. Whether the heating technology or the networking of the offices are state-of-the-art. In the production areas there are connections for the compressor system as well as sufficient high-voltage connections and networking.
The property is paved for up to 20 parking spaces as well as for tender. The rest is all green space that is available as growth potential for the future. So it is possible to expand the productive area 3 to 4 times.
The property is located in the closed area of the solar park, so that there is a high level of security here.
+++ Further information, pictures, floor plans and even more real estate can be found at www.schroeder-busch.de +++
Location description
The property is located in the former Solar Valley Park Thalheim, a commercial facility that is in a state of upheaval due to the closure of solar plants. It is only a few minutes by car to Bitterfeld. The park is only a few meters away from the B 183 and the A9.
Images



















